Cut Optimizer \u00b7 6 fab orders selected
Auto-pack against current stock \u00b7 2D cutting-stock heuristic \u00b7 78% utilization \u00b7 4 sheets consumed \u00b7 3 remnants returned
Output \u00b7 cut diagrams
4 stock sheets consumed \u00b7 color-coded per fab order line
FAB-88FAB-89FAB-91FAB-93FAB-94FAB-95wasteremnant
\u25c6
Per-line override:click any cut piece on a diagram to force it to a different sheet, mark it as “save for later”, or split into multiple pieces. Manual overrides preserve across re-runs.
Optimization summary
Batch FAB-CUT-2026-038 \u00b7 6 fab orders \u00b7 4 stock sheets
Sheets consumed
4
cost basis $312.80
Total cuts
13
across 6 fab orders
Utilization
78%
target 78% · met
Total waste
12%
≈ $37.50 scrap
Remnants returned
3
≈ $44.20 reusable