NightshiftNIGHTSHIFT
Community
My Work
Field Ops · Fab Shop

Fab Shop

In-house fabrication queue · 3 in queue · 4 in fab · 2 ready today · pacing $4.2k built today vs $4.5k goal
In queue
3$5.6k
oldest 1d · ready to cut
In fab right now
42 due 4p
Ramirez · Burke shop
Built today
2+$2.1k
2 jobs unlock
Avg cycle (7d)i
1.8d−0.3d
queued → built
On-time rate
94%+2 pts
last 30d · 47/50
Material yieldi
71%−3 pts
below 78% target →
Queued3 orders · awaiting cut$5,620 committed · ready for next batch
FAB-2026-091
IGUIGU 60×72 ½" tempered + low-iron · argonx2SHOP
GD-10847 Pritchard master shower · sold 4/22 · need by 4/29
unassigned
cut due 4/27
Ready: Today 3:00 PM
Shop fab
queued
FAB-2026-092
mirrorMirror polish 36×72 · ¼" silvered · seamed edgesx1SHOP
GD-10859 Stevenson gym mirror · sold 4/23 · need by 4/30
unassigned
cut due 4/28
Ready: Today 3:00 PM
Shop fab
queued
FAB-2026-093
storefrontCut flat-glass 48×96 · ¼" tempered clearx6 panelscommercialSHOP
GD-C-2049 Hamilton storefront · bid · need by 5/3
unassigned
cut due 4/30
Ready: Today 3:00 PM
Shop fab
queued
Cut2 orders · cut, awaiting fabCB & MR shop · stock-sheet pulled
FAB-2026-088
mirrorMirror polish 36×72 · ¼" · polished edges + safety backingVENDOR
GD-10843 Pritchard guest shower · cut from sheet S-204 · 12% waste
CBBailey
fab due 2:30p
Ready: Wed May 3
Vendor temper
cut
FAB-2026-089
IGUIGU 30×42 ⅜" clear · 7/16" spacer · argon-fillx4VENDOR
GD-10845 Mahler bay window · cut from sheets S-205, S-206 · 9% waste
MRRamirez
fab due 3:30p
Ready: Wed May 3
Vendor temper
cut
Fabricate2 orders · in fab right nowedgework, IG cavity build, temper queue
FAB-2026-085
IGUIGU 48×60 ¾" tempered + low-E #2 · argon · ½" spacerx3heat-soakSPLIT
GD-C-2048 Hartford Tower lobby · in IG cavity build · QC at 4p
EBBurke
QC at 4:00p
Ready: Wed May 3 (waiting on vendor)
fabricate
FAB-2026-086
showerTempered shower panel 32×72 ⅜" · polished edges + 2 hinge cutsx4 panels + 1 doorSHOP
GD-10841 Sheppard frameless · edge-polish in progress · awaiting temper slot
TNNguyen
temper at 4:30p
fabricate
QC1 order · waiting on QC sign-offBurke shop · checklist 4 of 5
FAB-2026-082
IGUIGU 24×36 ½" clear · ½" spacer · argonx2SHOP
GD-10838 Caldwell kitchen · QC checklist 4/5 · seal pressure pending
EBBurke
close at 3:15p
qc
Built2 orders · built today, fired material_ready2 jobs unlocked for scheduling
FAB-2026-079
mirrorMirror table-top 24×48 ¼" · polished edges + corner radiusSHOP
GD-10832 Whitaker office · fired job.material_ready 11:14a · scheduled Mon
CBBailey
built 11:14a
built
FAB-2026-080
IGUIGU 36×54 ½" clear + low-E · ½" spacerx2SHOP
GD-10835 Hartford bay window · fired job.material_ready 1:48p · scheduled Tue
MRRamirez
built 1:48p
built
Ready1 order · staged for truck loadoutSend to Truck Loadout
FAB-2026-077
showerFrameless shower panels 28×72 ⅜" · 3 panels + doorSHOP
GD-10828 Bennett pivot rebuild · staged on rack B-3 · install Mon 4/28
CBBailey
staged · rack B-3
ready
D